Project Details

Project Description

HISTORY

The new stadium is meant to be very similar in design to the original Yankee Stadium, both in its original 1923 state and its post-renovation state in 1976. The playing field that closely mimics the 1988–2008 dimensions of the old park.

SCOPE OF SERVICES

To design a state-of-the-art surface and sub-surface drainage collection system for the stadium baseball field. The main ballpark stadium playing field is natural turf (Kentucky Bluegrass) playing field surface. The surface grading of the playing field was designed to meet the MLB standards. The master under drain collection systems (featuring over 14,000 feet of pipe) that makes the field playable one (1) hour after taking 2 inches of rain.

The dimensions of the field precisely mimic that of the old Yankee Stadium, and the scalloped grandstand facade it also meant to invoke the old ballpark in the Bronx. When completed, the $1.5 billion overall construction cost makes it not only the most expensive baseball stadium ever built, but the second-most expensive stadium of any kind.

*Key FTE members provided these services during employment with another firm.

Major Leagur Baseball - Fort Bragg Game

Fayetteville, North Carolina

  • Architect : Populous I Brightview
  • Role : Playing Field Consultant
  • Status : Completed July 03, 2016

Marlins Park (MLB) Stadium

Miami, Florida

  • Architect : Populous
  • Role : Playing Field Consultant
  • Status : Completed in 2010

Target Field Stadium - Minnesota Twins

Minneapolis, Minnesota

  • Architect : Populous
  • Role : Playing Field Consultant
  • Status : Completed in 2010