Project Details

Project Description

FTE was retained to prepare a master effluent water irrigation study to analyze the existing stormwater pond water quality adjacent to the proposed stadium site for primary irrigation usage and research the alternative domestic water system. A cost benefit analysis was provided to assist in determining the short and long term costs associated with the construction of the master effluent irrigation system compared to the use of the domestic water supply.

The water demand for a natural turf soccer field is typically designed at a higher level of water usage. Peak water demand is based on the ability to irrigate the entire field during halftime.

FTE is also providing professional playing field engineering services to Populous for the final construction plans for the playing field grading, sub-surface grading, underdrain collection piping system, irrigation system, construction details and specifications.

Wyandotte Youth Soccer Complex

Kansas City, Kansas

  • Architect : Populous
  • Role : Ownership Playing Field Project Manager
  • Status : Projected to be completed in Fall 2017

Swope Soccer Village

Kansas City, Missouri

  • Architect : HKS
  • Role : Ownership Playing Field Project Manager
  • Status : Currently under Construction-Completion Scheduled for 2017 STF Season

Rochester Rhinos – Paetec Park

Rochester, New York

  • Architect :Populous (formerly HOK Sport)
  • Role : Playing Field Designer
  • Status : Completed in 2006

Copyright © FTEsports 2017
All rights reserved. Privacy Policy.