FTE was retained to prepare a master effluent water irrigation study to analyze the existing stormwater pond water quality adjacent to the proposed stadium site for primary irrigation usage and research the alternative domestic water system. A cost benefit analysis was provided to assist in determining the short and long term costs associated with the construction of the master effluent irrigation system compared to the use of the domestic water supply.
The water demand for a natural turf soccer field is typically designed at a higher level of water usage. Peak water demand is based on the ability to irrigate the entire field during halftime.
FTE is also providing professional playing field engineering services to Populous for the final construction plans for the playing field grading, sub-surface grading, underdrain collection piping system, irrigation system, construction details and specifications.