SCOPE OF SERVICES
To prepare the project playing field performance specifications for “Natural/Synthetic” playing field surface as it related to the renovation of the existing stadium baseball field. The playing field specification contained all the required playing field components necessary in order to meet the NCAA standards and insurance that the quality assurance and quality control program for the playing field construction would result in the standards being met. In addition, the University requested that the new playing field design incorporate a new state of the art sub-surface underdrain collection system and details for the new playing field renovation. FTE was retained to provide on-site quality control and quality assurance during the construction phase.
Copyright © FTEsports 2017
All rights reserved. Privacy Policy.